Sign In | Join Free | My chinaqualitycrafts.com |
|
Brand Name : ABD
Certification : CE Certifcation
Place of Origin : Guangdong, China
MOQ : 1 set
Price : Negotiation
Supply Ability : 10 Set/Sets per Month
Video outgoing-inspection : Provided
Material : Aluminium alloy profiles and relational products
Product type : Vertical powder coating production Line
Applicable Industries : Construction projects, manufacturing facilities, retail establishments, and shops that repair machinery
Marketing Type : Hot Product 2024
Heating power : Natural gas, LPG, diesel oil
Machine Type : Powder spray line, Spray Booths, Painting Equipment, Plc Controller Programmable Logic Controller, Pre-treatment Equipment, Conveying Equipment, Drying Oven, Curing oven, Coating Equipment
Keywords : Powder coating plant
Technology : Environmental protection
ABD PLC Control System Full-Automated Powder Coating Production Line Environmental Protection
Vertical Extrusion Aluminium Profile Powder Coating Production Line
*Full automatic control:Operation from the upload of original hanging profile to the download of finished coating profiles is completely automatic controlled.
*High productivity :As the requirement of customer,1000T/月---2500T/月
*Small area occupation:The occupied area of a 2000T/M coating line is W20m×L53m only.
*Low energy consumption :The square shape design of curing oven ensures the extreme high usage ratio of heat energy.
Save manpower:Automatic control ,reduce the manpower cost.
*Saving powder consumption:High efficiency for primary powder coating.Film thickness of workpieces is uniform,saving 15%powder comparing with horizontal powder coating system.
The seller will send the technician to provide the suggestions and advices of the installation, but the buyer is responsible for the air ticket cost, accommodation, meals and USD 100 / per day for each technician. If it causes extra charges during virus period, like quarantine hotel, food, test, local transportation and other costs, should be covered by the buyer.
The installation date of machine should be friendly discussed by the Buyer and the Seller.
Time: manufacture: 4 months. Installation and test: 2 months.
The valid date of this quotation is 3 months since provided.
Payment: 100% TT, at sight. (Within 14 days after the date of contract signature, 30% of the full contract amount should be released from the TT to the Seller’s beneficial account. When the shipment is ready, 65% of the full contract amount should be released from the TT to the Seller’s beneficial account. Within 30 days after the machine is installed and commissioned, 5% of the full contract amount should be released from the TT to the Seller’s beneficial account.)
1. What should we provide if interested in your equipment ?
A. The material/size(max)/weight(max)of your workpieces.
B. What is the expected output of this equipment (8 hours/day,or 30 days/per month )?
C. The available workshop space which you plan to place this set of equipment(in LxWxH) ?
D. What fuel do you prefer to use for heating system:Electric,Gas,LPG,Diesel or others?
2. How to install equipment after purchasing your equipment ?
A. We will provide installation documents ,3D assembling drawing or installation video to guide the installation work.
B. Our engineer will guide the equipment's installation and debugging on line.
C. We can arrange installers to your factory to guide the installation work if needed,this service is chargeable.
D. After the debugging, will provide complete training and track the equipment's usage regularly.
3. How is your company's after-sales service done?
A. 1 year parts warranty, parts mainly include fans,burners,electric components of control cabinet,metal structure,wall panels etc,except the case of man-made damage.
B. As long as you have been using our equipment, our technical support will always be online
Hope our warm company can meet friendly you and bring you a different experience.
Q1:Are you manufacturer?
![]() |
SUS Substrate CE Certification Full-automatic Spraying Gun Vertical Powder Coating Line Images |